Chicago Bath Works
Gallery

Look Closely. The Details Hold Up.

Every photograph is a real bathroom in a real Chicago property, ours from demolition to silicone. Showers, tubs and surrounds, vanities and lighting, and the rooms as we found them. No stock images. No renderings.

Get an estimate

Curbless pans, glass, niches and the waterproofing you never see.

Before, and after

Tap Before on any of these. The two frames are rarely shot from the same spot, because on day one there is usually something standing where the camera needs to be. The details hold up close.

Lakeview condo, second bath, finishedLakeview condo, second bath, before we started
Lakeview condo, second bathThe tub alcove we found, and the walk-in that replaced it.
Forest Park bungalow, hall bath, finishedForest Park bungalow, hall bath, before we started
Forest Park bungalow, hall bathOriginal 1950s vanity wall, rebuilt around a new tub and surround.
Emerald Avenue, main bath, finishedEmerald Avenue, main bath, before we started
Emerald Avenue, main bathPink tile and a curtain rail, out. Full tub surround, in.
Rhodes Avenue, second floor, finishedRhodes Avenue, second floor, before we started
Rhodes Avenue, second floorDated tub and subway, replaced top to bottom with brass.
Lakeview high-rise, primary bath, finishedLakeview high-rise, primary bath, before we started
Lakeview high-rise, primary bathA tired builder bath in a condo tower, taken to the studs.
Pensacola Avenue, lower level, finishedPensacola Avenue, lower level, before we started
Pensacola Avenue, lower levelA basement washroom nobody would use, rebuilt.

Take a closer look. So look at it from three feet away.

Open any photograph full size. The joints, reveals and caulk lines are where the workmanship shows.

The craft

What separates a bathroom that lasts from one that leaks

Anybody can set tile on a wall. In a Chicago building the wall is not flat, the floor is not level and the joists under it have been carrying a wet bathroom for eighty years. The work is everything that happens before the first tile.

The last five percent is what you live with every day. A membrane that was tested, corners that were siliconed rather than grouted, and a fan that actually reaches the outside of the building.

The waterproofing is tested, not assumed

The pan is filled and left overnight before a tile is set. It is the only way to know, and it is the step that gets skipped on a fast job.

The layout is drawn before it is cut

Courses that land whole at the ceiling, a niche that lines up with the joints, and cuts pushed to the corner nobody looks at. That is a drawing, not a decision made on a ladder.

The room gets the fan it needs

Sized to the volume and ducted to the outside of the building. A bathroom that stays wet for an hour after a shower has a duct problem, and no amount of new tile fixes it.

Small jobs are welcome

One vanity, one leaking shower or a set of new fixtures. We quote the smaller jobs many remodelers pass over, and they get the same care as a full gut.

Ready to fix yours?

Send a photo from your phone. We will visit, measure and prepare a free written estimate. No obligation.

Free written estimates. Insured. A person answers Monday to Saturday.