Guest bathroom remodel
Used occasionally but noticed every time. Because the room needs so little material, one distinctive tile can carry the whole design.

Why this is worth doing properly
Everything out and everything back: layout, waterproofing, tile, fixtures and light. One crew and one coordinated scope, from the first demolition bag to the last bead of silicone.
What you get from us
- 01
The wet area is waterproofed as an assembly
A bonded membrane covers the wet area. Every corner, fastener and pipe is sealed, then the assembly is flood tested before tile goes on.
- 02
You see what was behind the old tile
If we find rot, a notched joist or an old leak, you get photos and a written price before we cover anything up.
- 03
One crew, start to finish
The same crew handles the job from demolition to final silicone. Separately licensed plumbing and electrical contractors work on our coordinated schedule.
- 04
Small jobs are welcome
One vanity, one leaking shower or a set of new fixtures. We quote the smaller jobs many remodelers pass over, with the same care as a full gut.
Often paired with
Everything in full bathroom remodels, all of it ours:
137 services, one room
Guest bathroom remodel is one of 13 things we do under full bathroom remodels, and one of 137 across the whole catalogue.
Browse all servicesTell us what is not working.
Send a few details. We will visit, measure and prepare a free written estimate. No obligation.
Free written estimates. Insured. A person answers Monday to Saturday.
