Walk-in shower
A full height tiled shower with a real door, sized so somebody can get past the swing. Built as a waterproofed box first and tiled second.

Why this is worth doing properly
The wet part of the room, and the part that fails first when it is built quickly. Every shower we build is waterproofed as an assembly rather than as a layer of grout, and it is tiled to a layout drawn before the first cut.
What you get from us
- 01
The wet area is waterproofed as an assembly
A bonded membrane covers the wet area. Every corner, fastener and pipe is sealed, then the assembly is flood tested before tile goes on.
- 02
You see what was behind the old tile
If we find rot, a notched joist or an old leak, you get photos and a written price before we cover anything up.
- 03
One crew, start to finish
The same crew handles the job from demolition to final silicone. Separately licensed plumbing and electrical contractors work on our coordinated schedule.
- 04
Small jobs are welcome
One vanity, one leaking shower or a set of new fixtures. We quote the smaller jobs many remodelers pass over, with the same care as a full gut.
Often paired with
Everything in showers and enclosures, all of it ours:
137 services, one room
Walk-in shower is one of 14 things we do under showers and enclosures, and one of 137 across the whole catalogue.
Browse all servicesTell us what is not working.
Send a few details. We will visit, measure and prepare a free written estimate. No obligation.
Free written estimates. Insured. A person answers Monday to Saturday.
